SIMPLER - Silent Installation of MonoPiLEs Retrievable
Vibrojet® is an innovative installation method for offshore wind turbine foundations that uses advanced technology to comply with regulations and effectively install larger turbines, supporting the EU's green energy goals.
Projectdetails
Introduction
GBM has developed Vibrojet® as an urgently needed alternative for the hydraulic hammer currently used for the installation of offshore wind turbine foundations. The current method has increasingly faced difficulties in installing the much-needed larger wind turbines and complying with stricter regulations.
Process Overview
Vibrojet® involves the whole monopile, including:
- Vibrating it
- Jetting the soil below the monopile
- Creating a fluidized bed in the hollow monopile
This process is managed by a control system with a high-tech sensor network based on edge computing concepts using deep learning and artificial intelligence.
Benefits
Vibrojet® reduces the soil resistance temporarily to such an extent that the huge monopile sinks down silently and gently to the target depth under its own weight.
Compliance and Impact
Vibrojet® is compliant with regulations and is able to install the larger wind turbines very effectively. This innovation accelerates the rollout of offshore wind energy farms that are needed to enable the EU to achieve its shore green deal goals.
Financiële details & Tijdlijn
Financiële details
Subsidiebedrag | € 2.455.635 |
Totale projectbegroting | € 3.508.050 |
Tijdlijn
Startdatum | 1-5-2023 |
Einddatum | 31-12-2025 |
Subsidiejaar | 2023 |
Partners & Locaties
Projectpartners
- GBM WORKS B.V.penvoerder
- GBM WORKS HOLDING BV
Land(en)
Vergelijkbare projecten binnen EIC Accelerator
Project | Regeling | Bedrag | Jaar | Actie |
---|---|---|---|---|
Sub Sea Quieter, a disruptive, low cost and highly efficient Noise Mitigation System for reducing MRE installation noise and turbidity impacts on underwater ecosystemsDeveloping the SSQ Pile Driving, an innovative and cost-effective noise mitigation system for offshore wind farms, to protect marine life while enhancing acoustic efficiency and adaptability. | EIC Accelerator | € 2.392.687 | 2023 | Details |
Sub Sea Quieter, a disruptive, low cost and highly efficient Noise Mitigation System for reducing MRE installation noise and turbidity impacts on underwater ecosystems
Developing the SSQ Pile Driving, an innovative and cost-effective noise mitigation system for offshore wind farms, to protect marine life while enhancing acoustic efficiency and adaptability.
Vergelijkbare projecten uit andere regelingen
Project | Regeling | Bedrag | Jaar | Actie |
---|---|---|---|---|
SMI-Innovatief geluidloos offshore installatieconcept monopilesMarine Innovators B.V. ontwikkelt een innovatief geluidloos installatieconcept voor zware monopiles, gericht op kostenreductie en duurzaamheid in de offshore windenergie sector. | Mkb-innovati... | € 20.000 | 2022 | Details |
Sustainable Installation of XXL MonopilesHet SIMOX-project ontwikkelt en valideert innovatieve installatie- en ontmantelingstechnologieën voor XXL-monopiles van offshore windturbines, gericht op duurzaamheid, kosteneffectiviteit en milieuvriendelijkheid. | Missiegedrev... | € 3.967.419 | 2021 | Details |
Next Generation NMSHet project onderzoekt een Next Generation NMS om offshore windfundaties efficiënter en milieuvriendelijker te plaatsen, met lagere kosten en minder impact op zeezoogdieren. | Mkb-innovati... | € 169.072 | 2016 | Details |
Nieuwe functionaliteiten Vibro Lifting Tool; tapse palen, variabel moment trilblok, elektrificeren.Het project onderzoekt de haalbaarheid van drie nieuwe functionaliteiten voor de Vibro Lifting Tool, met als doel een go of no go te bepalen voor verdere ontwikkeling. | Mkb-innovati... | € 20.000 | 2021 | Details |
Windmolenfundaties verwijderenHigh Five Solutions ontwikkelt een innovatieve machine om funderingspalen van oude windmolens efficiënt te verwijderen, ter ondersteuning van de energietransitie en circulariteit. | Mkb-innovati... | € 183.343 | 2019 | Details |
SMI-Innovatief geluidloos offshore installatieconcept monopiles
Marine Innovators B.V. ontwikkelt een innovatief geluidloos installatieconcept voor zware monopiles, gericht op kostenreductie en duurzaamheid in de offshore windenergie sector.
Sustainable Installation of XXL Monopiles
Het SIMOX-project ontwikkelt en valideert innovatieve installatie- en ontmantelingstechnologieën voor XXL-monopiles van offshore windturbines, gericht op duurzaamheid, kosteneffectiviteit en milieuvriendelijkheid.
Next Generation NMS
Het project onderzoekt een Next Generation NMS om offshore windfundaties efficiënter en milieuvriendelijker te plaatsen, met lagere kosten en minder impact op zeezoogdieren.
Nieuwe functionaliteiten Vibro Lifting Tool; tapse palen, variabel moment trilblok, elektrificeren.
Het project onderzoekt de haalbaarheid van drie nieuwe functionaliteiten voor de Vibro Lifting Tool, met als doel een go of no go te bepalen voor verdere ontwikkeling.
Windmolenfundaties verwijderen
High Five Solutions ontwikkelt een innovatieve machine om funderingspalen van oude windmolens efficiënt te verwijderen, ter ondersteuning van de energietransitie en circulariteit.